24 X 7 Support : +91-9999333296

Combined Ceiling

Combined Ceiling

Product Details

C shaped ceiling installation
1. Installing the sideline in the same height
2. Installing main channel in appreciate space, the normal space is 1 – 1.2m to suspension rod by clip in profile holder.
3. Suspension rod should be installed according to main channel at a distance of 1.2m centre to centre.
4. Binding the clip in profile with main channel with the help of clip in profile holder at space according to the width of tile .
5. Pressing the two parallel edges of tiles to the clip in profile for proper engagement
6. Wearing gloves when installing panel , if figure print or stain remain on the panel , please remove it with warm water and detergent , then dry it.Combined ceilingCombined ceiling