24 X 7 Support : +91-9999333296

Louver Ceilings

Louver ceilings

Product Details

Louver ceiling installation
1 Installing the sideline in the same height
2. Installing main channel in appreciate space, the normal space is 1 – 1.2m to suspension rod by clip in profile holder.
3. Suspension rod should be installed according to main channel at a distance of 1.2m centre to centre.
4. Binding the Louver carrier with main channel with the help of carrier holder at space 1.2mtr to 1.5mtr.
5. Pressing the Louver panel to the prongs of Louver carrier perpendicular to the it.
6. Wearing gloves when installing panel , if figure print or stain remain on the panel , please remove it with warm water and detergent , then dry it.Louver ceilingLouver ceiling

Testings
Frame & smoke spread Class A (ASTM E84)
Light Reflectance (White) Lr1
Stability under humidity Yes
IAQ Friendly Yes
VOCs No
Fiber Content No
Moisture Resistance Excellent
Life Cycle Excellent